If you own or are buying riverfront property in Hudson, a dock can transform how you use your home. It also touches sensitive shoreline rules, multiple agencies, and seasonal riverway limits. This guide walks you through permits, setbacks, slip counts, and timing so you can plan with confidence on the Lower St. Croix.
Why dock rules matter for waterfront owners
Well planned docks protect navigation, shoreline habitat, and your long term property value. On the St. Croix, approvals are layered. Wisconsin DNR sets statewide standards for piers, slips, and buoys in navigable waters. The U.S. Army Corps of Engineers may oversee work in federal waters. The Lower St. Croix Riverway adds scenic and environmental protections. The City of Hudson and St. Croix County have local shoreland rules. Getting it right up front saves time, money, and stress.
What follows is a simple, step by step overview tailored to Hudson so you can design a compliant dock and choose the right slips and lifts.
Planning your dock: goals and site
Use and capacity needs
Start with how you will use the river.
- What boats do you own today, and what might you add in the next 5 years?
- How many slips do you need, and will you use lifts or mooring buoys?
- Do you host guests who need temporary tie ups?
Your shoreline frontage controls slip counts under Wisconsin’s formula for non commercial, single riparian owners: up to two slips for the first 50 feet of frontage, plus one additional slip for each full additional 50 feet of frontage. Exceeding those limits usually triggers a permit. Review the DNR’s guidance for exemptions and formulas before you design from Wisconsin DNR pier and recreation pages.
Shoreline and water conditions
Walk your bank at high and low water. Note current, depth, wakes, and wind fetch. A narrow channel or heavy traffic may favor a narrower, seasonal or floating configuration. A deeper, quieter pocket might allow a stable layout with lifts. DNR’s exemption guidance often references a 6 foot pier width and reaching only to where you have about 3 feet of depth at summer low water or the depth needed to safely moor your boat per WDNR guidance.
Property lines and riparian area
Side lot lines on land project into the water. Your dock must respect those extensions and your neighbors’ riparian rights. Sketch your side lines on a site plan and keep maneuvering room for both properties. If lots are angled, consider a shorter layout or a shared docking agreement.
HOA and covenants
If you are in a neighborhood on Lake St. Croix, check HOA rules. Private covenants can be more restrictive than public standards. Many associations limit dock counts, styles, or shared facilities.
Permits and approvals: who’s involved
Multiple entities can apply. Contact them early with a clear sketch and your slip count so you can choose the right path.
State and environmental regulators
Wisconsin DNR regulates piers, docks, lifts, and mooring buoys in navigable waters. Many small residential piers are exempt if they meet width, length to depth, and slip count criteria. Others need a state permit. DNR also guides mooring buoy placement, including typical distance-from-shore thresholds and effects on public rights see WDNR waterways overview.
Shoreland setbacks for buildings are typically 75 feet from the ordinary high water mark, but piers and certain water access structures are treated separately under Chapter 30 rules. Keep building setback rules and pier rules distinct when you plan state shoreland program overview.
City and county departments
Inside the City of Hudson, review city ordinances for park piers, the municipal mooring area, and any local approvals that touch docks and buoys City of Hudson code portal. If you are outside city limits, St. Croix County administers shoreland zoning, Lower St. Croix overlays, and permits tied to shoreline work and vegetation St. Croix County Land Use and Zoning.
Federal riverway authorities
The Lower St. Croix is a National Scenic Riverway. Wisconsin Administrative Code NR 118 sets riverway standards, and projects must comply with those standards in addition to state and local rules NR 118 standards overview. The National Park Service may require special use permits when park resources or visitor use could be affected NPS riverway permits.
The U.S. Army Corps of Engineers, St. Paul District, oversees structures and work in navigable waters. Many routine residential docks and buoys are authorized under Nationwide Permits, sometimes with regional conditions. Check whether a pre construction notification is required for your design USACE St. Paul District NWPs.
Utilities, marinas, and HOAs
If you share shoreline or easements, coordinate early. Shared docks, private marina slips, and HOA facilities have their own rules, insurance, and allocation processes. These private approvals are separate from permits.
Setbacks and size: placement basics
Side lines and neighbor buffers
Aim to keep your dock centered in your riparian area with comfortable clearance from side lines so boats can enter and exit without conflict. If frontage is tight, consider a single slip with a lift to reduce width.
Depth, navigation, safety clearances
Design to the depth you need for safe mooring and turning without pushing excessively into the channel. DNR’s exempt guidance commonly references reaching only to about 3 feet of water at summer low levels or to the depth needed for your boat per WDNR. Keep a clean approach and sight lines for paddlers and emergency access.
Channels and sensitive habitats
Stay well clear of marked channels, shallows used by spawning fish, and vegetated beds. On the Lower St. Croix, scenic and natural resource protection is a priority under NR 118, so low profile designs and limited visual impact are preferred NR 118 riverway standards.
Length, height, and area limits
For most residential projects to remain exempt at the state level, common guideposts include:
- Pier width around 6 feet or less.
- Length limited to necessary depth for safe mooring.
- Slip count within the frontage formula. If your plan exceeds any of these, expect to pursue a WDNR permit and possibly federal or local approvals WDNR recreation structures guidance.
Also remember the building setback: most structures on land must be 75 feet from the ordinary high water mark, but piers are handled under separate criteria state shoreland program.
Slips and lifts: design options
Single vs. multi slip layouts
- Single slip: Smaller footprint and easier to fit on narrow frontage. Good for one family boat with a lift.
- Two to three slips: More capacity for guests, jet skis, or a second boat. Requires more frontage and careful maneuvering space. Keep the frontage based slip formula in mind to stay within exemptions WDNR docking guidance.
Materials and decking choices
Aluminum frames and composite decking keep weight and maintenance low. Wood feels warm but needs more care. On a scenic riverway, low glare, neutral tones, and open style decking reduce visual impact and help light reach the water.
Permanent, seasonal, floating systems
- Seasonal sectional: Popular on rivers with ice. Easy to remove and store.
- Floating: Adapts to changing water levels. Consider anchoring and wake exposure.
- Permanent piles: Stable but more involved to permit and install. Often not necessary for small residential needs.
Winterization and seasonal removal
Plan for lift canopies, ice protection, and off season storage. Seasonal removal can reduce wear and lower risk from ice movement.
Timeline and budget: hiring help
Planning and lead times
A smooth path follows this sequence:
- Measure frontage and sketch your concept with slip counts.
- Check DNR exemptions and Riverway standards.
- Talk with city or county staff about local overlays.
- Confirm any USACE applicability.
- Finalize drawings, then order materials.
DNR exemptions and general permits can be relatively fast. Individual permits and federal coordination can add months, and Riverway review may add steps. Build in time for each agency’s review WDNR process overview and USACE regional permits.
Bids, contracts, insurance
Seek multiple bids with identical scope: pier width, length, slip count, lifts, decking, and installation method. Ask about lead times, warranty, liability coverage, and who handles permit submittals. Keep all permits and approvals in your project file.
Build windows and inspections
River conditions, fish spawning windows, and park use can affect timing. Some approvals include seasonal work windows or inspection check points. Confirm staging, access, and erosion control expectations with your contractor and the reviewing agencies.
Maintenance and compliance
Keep the dock within approved dimensions. If you plan to add slips or expand platforms later, reassess permits first. Renew any annual local permissions and pay municipal mooring fees on time if you use city facilities City of Hudson moorings info.
Permits and approvals: quick reference checklist
- Wisconsin DNR: Review exemptions, slip formulas, buoy placement, and apply if needed WDNR piers and recreation.
- City of Hudson or St. Croix County: Shoreland and local approvals, overlays, and zoning conditions City code portal and County zoning.
- Lower St. Croix Riverway: Ensure your plan aligns with NR 118 standards; consult the National Park Service as needed NR 118 standards and NPS permits.
- U.S. Army Corps: Confirm Nationwide Permit coverage or notifications for structures in navigable waters USACE St. Paul District.
Move forward with local guidance
A well designed, compliant dock adds everyday joy and future resale value. On the Lower St. Croix, the smartest path is simple: define your needs, sketch your plan, confirm exemptions and slip counts, and coordinate with each agency before you order materials.
If you are weighing a dock project alongside a purchase or sale, the details matter for value, insurance, and timing. The Platinum Real Estate Team helps Hudson waterfront owners understand buyer expectations, marketability, and the steps that keep deals smooth. Request Your Complimentary Home Valuation, and let’s discuss your shoreline goals and timing.
FAQs
Do I need a permit for a small residential dock in Hudson?
- Many small piers are exempt if you meet Wisconsin DNR limits for width, length to necessary depth, and slip counts. If you exceed any threshold, you will likely need a DNR permit and possibly federal or local approvals WDNR overview.
How many slips can I have on my frontage?
- For most non commercial single owner shorelines, the state formula allows up to two slips for the first 50 feet of frontage, plus one more slip for each full additional 50 feet. Going beyond that typically requires a permit DNR guidance.
What about the 75 foot setback from the water?
- That setback applies to most buildings on land in shoreland zones. Piers and certain water access structures are handled separately under Chapter 30 rules. Plan both your on land and in water elements to meet the right standard state shoreland program.
Do I need federal approval too?
- You may. The Lower St. Croix is navigable and a National Scenic Riverway. Many small docks and buoys fall under Army Corps Nationwide Permits, sometimes with conditions. Check with the St. Paul District to confirm USACE NWPs. NPS may also be involved for Riverway resource protection NPS permits.
Are there local Hudson rules I should know?
- Yes. Inside city limits, review Hudson’s code for park piers and the municipal mooring area. Outside the city, St. Croix County handles shoreland zoning and riverway overlays City code and County zoning.
Can I place a mooring buoy instead of a lift?
- DNR guidance allows certain near shore single boat buoys without a permit if they do not harm public rights or neighbors’ riparian use. Beyond typical distances, or if impacts are likely, a permit is required. Army Corps coverage may also apply under Nationwide Permit 10. Confirm details for your site WDNR guidance and USACE NWPs.
What is the Lower St. Croix Riverway and why does it matter?
- It is a protected scenic riverway with added standards for visual, ecological, and recreational quality. Your dock must meet those standards in addition to state and local rules, and some projects involve NPS coordination NR 118 and NPS permits.
How long does approval take?
- Exemptions and general permits can be quick. Individual permits, Corps coordination, and Riverway review can add months. Ask each agency for current timelines before scheduling materials and installers WDNR process and USACE St. Paul District.